Difference between revisions of "Astral Carpet Lounge"
(15 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
by Disorient Minigolf Cell<br> | |||
<br> | |||
Disorient created a minigolf hole that was installed as part of the Figment "City of Dreams" MiniGolf course. The course was installed on the island from June 27, 2008 to October 12, 2008, and was playable every weekend throughout the summer.<br> | |||
<br> | |||
Our hole, a combined minigolf hole and lounge space with airport-themed signage, formed the entry point into the "City of Dreams," as a place where one could escape the summer heat, lounge, socialize, and snooze.<br><br> | |||
[[Image:ACL_wideshot.jpg|500px]] | |||
== Installation & Deinstallation== | |||
<br> | |||
Installation of the base hole was completed by FIGMENT opening day on June 27, 2008, with completion of the Delta shade the next day. Ed & Ky performed the base install, with help from a few others on the Delta. It was a hit!<br><br> | |||
Deinstallation was performed by Archer & Jester Jaimi, who stored the hole on Governor's Island.<br><br> | |||
[[Image:ACL_robo.jpg|400px]][[Image:ACL_crowded_med.jpg|400px]] | |||
<br> | |||
== Proposal == | == Proposal == | ||
Line 9: | Line 24: | ||
* windsocks in the form of Disorient camp members? | * windsocks in the form of Disorient camp members? | ||
== Project Outline == | == Project Outline == | ||
Line 28: | Line 30: | ||
[http://figmentnyc.org FIGMENT] is a festival taking place on Governor's Island in late June. Figment has also been asked to install a 9 hole mini-golf course on GI for the summer. The minigolf call for proposals can be found [http://figmentnyc.org/minigolf/FIGMENT%20Minigolf%20Call%20for%20Artists.pdf here]. | [http://figmentnyc.org FIGMENT] is a festival taking place on Governor's Island in late June. Figment has also been asked to install a 9 hole mini-golf course on GI for the summer. The minigolf call for proposals can be found [http://figmentnyc.org/minigolf/FIGMENT%20Minigolf%20Call%20for%20Artists.pdf here]. | ||
===Team | ===Our Team === | ||
* Friar Tuck | * Friar Tuck (team lead) | ||
* Lowroad | |||
* Robo | |||
* Archer | |||
* Ky | |||
* Midnight Morsel | |||
* Sherry Cherry | |||
* Jester Jaimi | |||
* Thunderstick | |||
* Charlie (of Pop Studios) | |||
* Ocean | * Ocean | ||
=== Dates === | === Dates === | ||
ACL will be open during Figment 2008 from June 27-29 | ACL will be open during Figment 2008 from June 27-29 | ||
and every weekend until sometime in October 2008 | |||
=== Location === | === Location === | ||
Line 48: | Line 54: | ||
* Free Ferry [http://figmentnyc.org/2008/travelinfo.html schedule] and map | * Free Ferry [http://figmentnyc.org/2008/travelinfo.html schedule] and map | ||
== Development == | == Planning, Construction & Design == | ||
[[ | |||
=== Robo's design [[ACL_Plans]] === | |||
=== Construction & Build plan: [[ACL_Construction]] === | |||
=== Development stage: [[ACL_Development]] === | |||
==== Rendering by Ed ==== | |||
http://www.thegoodfriar.com/stuff/D8_Astral_Cpt_Lng_EVdrwg_s.jpg<br> | |||
([http://www.thegoodfriar.com/stuff/D8_Astral_Cpt_Lng_EVdrwg.jpg Larger Version]) | |||
==== Rendering by RoBo ==== | |||
http://igargoyle.com/images/covered.jpg<br/> | |||
==== Signage Concept ==== | |||
[[Image:ACLticket_34_smaller.jpg]] |
Latest revision as of 15:44, 11 March 2009
by Disorient Minigolf Cell
Disorient created a minigolf hole that was installed as part of the Figment "City of Dreams" MiniGolf course. The course was installed on the island from June 27, 2008 to October 12, 2008, and was playable every weekend throughout the summer.
Our hole, a combined minigolf hole and lounge space with airport-themed signage, formed the entry point into the "City of Dreams," as a place where one could escape the summer heat, lounge, socialize, and snooze.
Installation & Deinstallation
Installation of the base hole was completed by FIGMENT opening day on June 27, 2008, with completion of the Delta shade the next day. Ed & Ky performed the base install, with help from a few others on the Delta. It was a hit!
Deinstallation was performed by Archer & Jester Jaimi, who stored the hole on Governor's Island.
Proposal
The submitted proposal can be found here
Key Elements include:
- corrugated surface serving as part of the golf green as well as a lounge space (zero-g's)
- shade (Delta-shade)
- visually disorienting surface elements created using pink and orange astroturf
- windsocks in the form of Disorient camp members?
Project Outline
FIGMENT is a festival taking place on Governor's Island in late June. Figment has also been asked to install a 9 hole mini-golf course on GI for the summer. The minigolf call for proposals can be found here.
Our Team
- Friar Tuck (team lead)
- Lowroad
- Robo
- Archer
- Ky
- Midnight Morsel
- Sherry Cherry
- Jester Jaimi
- Thunderstick
- Charlie (of Pop Studios)
- Ocean
Dates
ACL will be open during Figment 2008 from June 27-29 and every weekend until sometime in October 2008
Location
- Annotated Google Map
- installation site is on grass
- Free Ferry schedule and map
Planning, Construction & Design
Robo's design ACL_Plans
Construction & Build plan: ACL_Construction
Development stage: ACL_Development
Rendering by Ed
Rendering by RoBo