Surface Tension
From Disorient wiki
A floating installation at Disorient Country Club since 2013 (date TBC)
Built by Viktor and crew
Original plan sketched-out by Viktor, Nuvoletta and The Eye at an Indian restaurant in the east village forever ago, someone else was at the table.
2022
Beaver damage
Beaver ate geometric wood uprights. Team deployed to replace beaver beams.
2018
2017
2016
2015
Additional geometry added
Surface Tension pulled from lake by Viktor to retrofit additional geometric elements using Simas Connectors.
CCIV
2014
Initial Build
Barrels picked up in Ridgewood by team driving truck up to CCIV. Built onsite by Viktor and Wallace with newly purchased air compressor and nail gun.
Launch
Launched Saturday night, May 31st after sunset