Difference between revisions of "Surface Tension"

From Disorient wiki
Jump to: navigation, search
Line 36: Line 36:
====Launch====
====Launch====
Launched Saturday night, May 31st after sunset<br>
Launched Saturday night, May 31st after sunset<br>
[[File:Surface_Tension_Launch.jpg|390px]]
[[File:Surface_Tension_Launch.jpg|390px]]  
====CCIV====
[[File:Surface_Tension_2014.jpg|390px]]
[[File:Surface_Tension_2014.jpg|390px]]

Revision as of 14:10, 2 June 2023

A floating installation at Disorient Country Club using Geodesic Temple construction elements since 2014

by Viktor and crew
Original plan sketched-out by Viktor, Nuvoletta and The Eye at an Indian restaurant in NYC's East Village, someone else was at the table.

2022

DisorientCCX.00002.jpg CCXSurfaceTensionNight.jpg
watch the video

Beaver damage

Beaver ate geometric wood uprights. Team deployed to replace beaver beams.

2018

Thomasegan 2018 Disorient Country Club.jpg


2017

390px

2016

2016 surface.jpg

2015

DisorientCountryClub2015SurfaceTension.1.jpg DisorientCountryClub2015SurfaceTension.2.jpg

Additional geometry added

Surface Tension pulled from lake by Viktor to retrofit additional geometric elements using Simas Connectors.

2015 cc retrofit .jpg CC-2014.jpg CCIV Surface Tension.jpg

2014

Initial Build

Barrels picked up in Ridgewood by team driving truck up to CCIV. Built onsite by Viktor and Wallace with newly purchased air compressor and nail gun.
Surfacce tension 2014.JPG

Launch

Launched Saturday night, May 31st after sunset
Surface Tension Launch.jpg Surface Tension 2014.jpg