Difference between revisions of "Astral Carpet Lounge"

From Disorient wiki
Jump to: navigation, search
Line 31: Line 31:


===Our Team ===
===Our Team ===
* RoBo
<br>
* Friar Tuck
* Friar Tuck (team lead)
* Ocean
* Lowroad
* Robo
* Archer
* Ky
* Midnight Morsel
* Sherry Cherry
* Jester Jaimi
* Jester Jaimi
* Thunderstick
* Thunderstick
* Charlie (of Pop Studios)  
* Charlie (of Pop Studios)  
* YOU?
* Ocean


=== Dates ===
=== Dates ===

Revision as of 16:26, 11 March 2009

by Disorient Minigolf Cell

Disorient created a minigolf hole that was installed as part of the Figment "City of Dreams" MiniGolf course. The course was installed on the island from June 27, 2008 to October 12, 2008, and was playable every weekend throughout the summer.

Our hole, a combined minigolf hole and lounge space with airport-themed signage, formed the entry point into the "City of Dreams," as a place where one could escape the summer heat, lounge, socialize, and snooze.

ACL wideshot.jpg

Installation & Deinstallation


Installation of the base hole was completed by FIGMENT opening day on June 27, 2008, with completion of the Delta shade the next day. Ed & Ky performed the base install, with help from a few others on the Delta. It was a hit!

Deinstallation was performed by Archer & Jester Jaimi, who stored the hole on Governor's Island.

ACL robo.jpgACL crowded med.jpg

Proposal

The submitted proposal can be found here

Key Elements include:

  • corrugated surface serving as part of the golf green as well as a lounge space (zero-g's)
  • shade (Delta-shade)
  • visually disorienting surface elements created using pink and orange astroturf
  • windsocks in the form of Disorient camp members?


Project Outline

FIGMENT is a festival taking place on Governor's Island in late June. Figment has also been asked to install a 9 hole mini-golf course on GI for the summer. The minigolf call for proposals can be found here.

Our Team


  • Friar Tuck (team lead)
  • Lowroad
  • Robo
  • Archer
  • Ky
  • Midnight Morsel
  • Sherry Cherry
  • Jester Jaimi
  • Thunderstick
  • Charlie (of Pop Studios)
  • Ocean

Dates

ACL will be open during Figment 2008 from June 27-29 and every weekend until sometime in October 2008

Location

Build Plan

by Ed Vessel

I. testing & improving zero-g prototype
- what needs to be adjusted?
- can the shape be made playable with additions in the edges?
- how do we make it structurally sound for walking (at least one section)?

II. build major components
- build 6 zero-g units, 2 of these for playing, 4 for lounging
- build start and finish straightaways (finish may be a down ramp)

III. surface elements
- modifying and tuning playing surface
- adding holes for water drainage
- cut roofing paper / waterproof rubber / etc. as a basic surface material
- astroturf: create astroturf patterns for each component and attach
directly to surface material
- attach astroturf/roofing surface (possibly on site)
- design & cut walls for edges & banks of the course

[ IV. OPTIONAL ] - Skill Shot
- this aspect of the design may be added depending on time
- design bypass for zero-g's
- cut holes & install piping

V. Delta shade
- settle on length and width of delta
- acquire fabric, cut, and attach to 2x4's
- build 4 8' triangles (on site)
- assemble delta (on site)
- secure to ground

VI. Signage / Props
- Airport / Magic Carpet Travel Port / Arrivals Lounge / DexAir
theme (to fit with the City of Dreams)
- settle on final set of signs
- create signs: either print & laminate or paint on wood? (to ensure they are weatherproof)
- attach to structure

VII. Installation
- as much as possible, each component of the hole will be built off-site
- date for transport and assembly on site is not yet set
- surface elements will be designed, cut & ready to attach once base components are placed


Current Design

Rendering by Ed

D8_Astral_Cpt_Lng_EVdrwg_s.jpg
(Larger Version)

Rendering by RoBo

covered.jpg

CAD Plans and Notes

ACL Plans

Logistics

ACL Construction

Signage Concept

ACLticket 34 smaller.jpg

Development

ACL Development